Skip to content
GDR Lab crew running a standard penetration test on a mining site

Services

Site & field testing

Boreholes, in-situ tests and full geotechnical investigation reports, run by our own crew and backed by our own laboratory.

  • 17 tests
  • NABL TC-16395
  • Lab & field team
  • Jaipur, Rajasthan

Overview

Site & Field Testing at GDR Lab

Some answers only the site can give. Our field division drills the boreholes, runs the in-situ tests and brings the samples back to our laboratory, which keeps the investigation in one pair of hands from the first borelog to the safe bearing capacity recommendation.

We mobilise across Rajasthan and to other states for mining, highway, building and industrial projects, with a crew sized to the job and reports written for the engineer who has to sign the foundation drawing.

GDR Lab crew running a standard penetration test on a mining site

What we test

  • Soil and rock boreholes with logging
  • Undisturbed and disturbed sampling
  • Working and test piles
  • Subgrade and earthwork layers
  • Machine foundations

Who this is for

  • Developers and builders needing SBC before foundation design
  • Mining and industrial projects with site investigation scopes
  • Highway and bridge contractors with pile load test obligations
  • Consultants outsourcing field work and laboratory support

Test list

17 tests, with the method for each

Need a test that is not listed, or a whole specification mapped to methods? Send us the schedule and we will come back with a quote.

Investigation and sampling

5 tests
  1. 01Geotechnical investigation and safe bearing capacity reportIS 1892 / IS 6403
  2. 02Boreholes in soil and rock, with borelogsMethod on request
  3. 03Rock core drilling and core recoveryMethod on request
  4. 04Undisturbed and disturbed samplingIS 2132
  5. 05Standard penetration test (SPT) with automatic trip hammerIS 2131

In-situ strength and bearing

5 tests
  1. 01Plate load testIS 1888
  2. 02Pile load test: vertical, lateral and pull-outIS 2911 Part 4
  3. 03Dynamic pile load testMethod on request
  4. 04Dynamic cone penetration test (DCPT)IS 4968
  5. 05Field CBRIS 2720 Part 31

Earthwork control

3 tests
  1. 01Field dry density, core cutterIS 2720 Part 29
  2. 02Field dry density, sand replacementIS 2720 Part 28
  3. 03Field moisture content and degree of compactionMethod on request

Geophysical and dynamic

4 tests
  1. 01Cross-hole seismic testASTM D4428
  2. 02Shear wave velocity measurementMethod on request
  3. 03Block vibration test for dynamic soil propertiesIS 5249
  4. 04Electrical resistivity tomography (ERT) and soil resistivityMethod on request

Methods are shown as commonly specified. The exact method, and whether a test sits inside our NABL scope of accreditation, is confirmed with your quote.

Where these tests are used

  • Foundation design for buildings, plants and towers
  • Pile integrity and capacity verification
  • Pavement and embankment compaction control
  • Machine foundation design from dynamic soil properties
  • Earthing design and subsurface profiling from resistivity

Often combined with

Clients ordering site & field testing usually also need

  • Soil Testing

    Classification, compaction, strength and permeability tests for foundation and pavement design.

    View tests
  • Rock Testing

    Strength and index properties of rock cores for foundations, tunnels and mining.

    View tests
  • NDT & Bridge Load Testing

    Non-destructive testing of concrete structures and full-scale bridge load tests.

    View tests

FAQ

Site & Field Testing: common questions

Can't find your answer? Ask us directly.

What do you need to quote a site investigation?

The site location, the plot or building footprint, the structure being planned, and the number and depth of boreholes if your consultant has already specified them. If not, we will suggest a scope.

Do you work outside Jaipur?

Yes. We mobilise across Rajasthan and travel to other states for larger scopes. Distance and site access affect the mobilisation cost, so tell us the location early.

How long does a site investigation take?

It depends on the number and depth of boreholes, the ground, and site access. We give you a programme with the quote and keep you posted as the drilling progresses.

Can you run pile load tests on working piles?

Yes, both initial tests on test piles and routine tests on working piles, with the loading arrangement and instrumentation set up to the IS 2911 Part 4 requirements.

Need site & field testing for your project?

Tell us the material and the tests; we reply within one working day.